Hakunila swimming hall

Vantaa, 2021

We supplied a 25 meter steel pool with equipment for the Hakunila swimming hall. Our delivery included overflow gutter gratings, pool lights, ladders, and railings. Additionally, we equipped the pool with lane markings, racing lanes and starting blocks. The pool was integrated into the existing water treatment system of the swimming hall.