Wintteri

Uusikaupunki, 2025

Wintteri, the new multipurpose center in Uusikaupunki, opened to the public in February 2025. The facility includes a new swimming hall featuring a 25 meter pool, diving pool, multipurpose pool, teaching and wading pool and cold plunge pool.

We provided a comprehensive solution for Wintteri, encompassing both the technical water treatment systems and a diverse range of pool equipment. The water treatment was implemented with ultrafiltration and automation. We also installed a 44.6 meter long water slide, which reaches a total length of 51.4 meters including the aqua catch. Our scope also included the installation of a small water slide, pool windows and Hexagone pool cleaning robots.

The delivery further consisted of pool equipment such as stainless steel pool railings, competition equipment, starting blocks, springboards, a pool lift and overflow gratings.