Orimattilan swimming hall

Orimattila, 2022

We implemented the ultrafiltration system and provided a pool equipment for the new Orimattila swimming hall. The water treatment system manages the purification for the 25 m pool, teaching and wading pools, and the multi-purpose pool. Our scope of delivery included Poolpod pool lifts, stainless steel railings, overflow gutter gratings, and starting blocks.